Preview only show first 10 pages with watermark. For full document please download

Construçõeshidráulicas Canal Hidroviario

Planilha para fazer o exercicio de canal hidroviário PHD 2413 Construções Hidraulicas

   EMBED


Share

Transcript

Exercício 1,,,,,,,,,,, ,,,,,,,,,,, NUSP,penúltimo,último,,,,,,,,, ,7,0,,,,,,,,, ,,,,,,,,,,, Dados,,,,,,,,,,, bc (m) ,11.00,,,,,,,,,, c (m),2.90,,,,,,,,,, m,2,,,,,,,,,, folga (m),1,,,,,,,,,, ,,,,,,SEM CRUZAMENTO,,,,, Sem Cruzamento,,,Com Cruzamento,,,,,,,, ,,,,,,,,,,, Seção,,,Seção,,,,,,,, bmin (m),24.2,,bmin (m),48.40,,,,,,, hmin (m),3.90,,hmin (m),3.90,,,,,,, B (m),39.8,,B (m),64.0,,,,,,, ,,,,,,,,,,, Verificação Efeito Pistão,,,Verificação Efeito Pistão,,,,,,,, Aseçmolhada (m²),124.8,,Aseçmolhada (m²),219.2,,,,,,, A1embmolhada (m²),28.7,,A1embmolhada (m²),28.7,,,,,,, NÃO VERIFICA,,,NÃO VERIFICA,,,COM CRUZAMENTO,,,,, ,,,,,,,,,,, REDIMENSIONAMENTO,,,REDIMENSIONAMENTO,,,,,,,, Aseção (m²),172.3,,Aseção (m²),287,,,,,,, bnovo (m),36.4,,bnovo (m),65.8,,,,,,, Bnovo (m),52.0,,Bnovo (m),81.4,,,,,,, ,,,,,,,,,,, ,,,,,,,,,,, ,,,,,,,,,,, ,,,,,,,,,,, Exercício 2,,,, ,,,, Sem Grandes Perturbações,,,, Vlimesc (m/s),2.0,,, ,,,, nmanning,0.025,,, ,,,, Sem Cruzamento,,,Sem Cruzamento, ,,,, Qmáx (m³/s),344.52,,Qmáx (m³/s),574.2 Rh (m),3.201230331,,Rh (m),3.45 i (m/m),0.00053,,i (m/m),0.00048 Exercício 3,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,, Dados,,,,,,,,,,,,,,, bc (m) ,11.00,,,,,,,,,,,,,, c (m),2.50,,,Atingir Meta ATÉ B20=B9,,,,OBS: Depois Arredonda O Valor de h e joga novamente em F7,,,,,,, m,2,,,h (m),6.774355256,,,,,,,,,, folga (m),1,,,,,,,,,,,,,, Qmáx (m³/s),400,,,,,,,,,,,,,, nmanning,0.025,,,h (m),6.774355256,,,,,,,,,, d50 (mm),5,,,i (m/m),6.1E-05,,,,,,,,,, g (kg/m³),1000,,,,,,,,,,,,,, ,,,,,,,,,,,,,,, Canal com Cruzamento,,,,Verificação Efeito Pistão p/ hmín,,,hmín,4.34,,,,,,, bmín,48.4,,,Amolhmín (m²),247.7,,Bmín,65.8,,,,,,, B (m),75.5,,,A1embmolh (m²),24.75,,,,,,,,,, A (m²),419.7,,,VERIFICA,,,Cálculo de Qmín,,,Com Cruzamento,,,,, Rh (m),5.332716251,,,,,,Amolh (m²),247.7,,,,,,, i (m/m),6.09446E-05,,,Verificação Vlimesc,,,i (m/m),6.1E-05,,,,,,, Qmáx (m³/s),399.9999986,,,Vlimesc (m/s),2,,P (m),67.80907004,,,,,,, ,,,,Qmáx/Amolh (m/s),0.95,,Rh (m),3.653304784,,,,,,, ,,,,VERIFICA,,,Qmín (m³/s),1.8E+02,,,,,,, ,,,,,,,,,,,,,,, ,,,,Verificação hmín,,,,,,,,,,, ,,,,hmín (m),3.5,,,,,,,,,, ,,,,h (m),6.774355256,,,,,,,,,, ,,,,VERIFICA,,,,,,,,,,, Exercício 4,,,, 1 - ENROCAMENTO LANÇADO,,,, ,,,, CS,1.2,,, d50 (mm),5,,, f (o),35,,, tgq,0.5,,, tcritmaterial,0.39,,INSTÁVEL, t´critmaterial,0.24,,, t´maxfluxo,0.244,,, "1,2t´maxfluxo",0.2925,,, ,,,, ,,,, DIMENSIONAMENTO,,,, t´critmaterial,0.2925,,, tcritmaterial,0.467518901,,, A15/A16,0.625643155,,, razão,0.626161843,,, d50novo (mm),5.99,,OBS: FAZER ATINGIR META ATÉ A17=A18, ,,,, ,,,, 2 - Gabião,,,, ,,,, Dados,,,, 2h (m),0.8,,, cotgteta,2,,, (1-V)*(Sr-1),1,> PEDRAS COMUNS DE PEDREIRO,, ,,,, ,,,, t (cm),13.3,,,